METTKO was formed in 2019 by Karel Osten, a process engineer with over 25 years experience in the design, operation, commissioning, optimisation and testing of pressure hydrometallurgy projects.
This started with work on the Lihir project, commissioned in 1997, and the latest completed project was the Copler Sulfide Expansion Project commisioned in 2018.
See below for a list of representative projects and the specialised equipment vendors involved in these projects.
Representative Pressure Hydrometallurgy Projects and Studies
•Copler POX Expansion, Turkey (Anagold)
•Concentrate Treatment Plant, Western Australia (IGO)
•Mansourah Massarah, Saudi Arabia (Ma'aden)
•Chelopech Pyrite POX, Bulgaria (Dundee Precious Metals)
•Pomalaa and Sorowako, Indonesia (Vale)
•Chelopech POX Expansion, Bulgaria (Dundee Precious Metals)
•Niquel do Vermelho, Brazil (Vale)
•Coral Bay Nickel, Philippines (Sumitomo Metals Mining)
•Murrin Murrin 5th Train, Western Australia (Glencore)
•Macraes Gold, New Zealand (OceanaGold)
•Lihir Gold, PNG (Newcrest)
Specialised Equipment Vendors on These Projects
•Caldera Engineering
•Carpentaria Corsi
•Coek Engineering
•Ekato
•Flowserve (Durametallic, Valtek)
•John Crane
•Koch Knight
•Loterios
•MH Wirth
•Mogas
•Rexa
•SPX / Lightnin
•Stebbins International
•Steuler / Didier
•Ti International
•Velan (Securemax)
•Weir (Geho, Delta)
METTKO